Manchester

Not all projects are glamorous, none the less, SBEM calculations are required on many types of buildings and all pose different problems.

Party walls and separating walls between unheated warehouse and heated office areas can cause compliance issues with Part L2A Criteria 2, which sets the minimum standards for U values.

HIBEC undertook the SBEM calculations on a logistics building in Manchester and were able to assist on, not only the required separating walls, but also on the optimal metal clad wall and roof core insulation thickness required. This enabled the specification to be relaxed from a 100mm core to an 80mm core, resulting in an unexpected saving for the developer.

The developer was then able, with HIBEC’s assistance, to evaluate an enhanced office environmental specification which would be within budget and lead to potentially higher rental, therefore giving a better return on investment.

 HIBEC were quick to save the developer time, energy and money.